Home About BC DR HA Support Training Download
You are here: Home/ Documentation/ Please Login or Register

-
Current Location
-

js
  Documentation
-
AIX Admin Methodology
Global Consolidation Project
All AIX admins should join
www.aixexpert.com


Join our LinkedIn Group
AIX Advanced Technical Experts
Contract Opportunities

www.LinkedIn.com

-
digg Digg this page
del.icio.us Post to del.icio.us
Slashdot Slashdot it!


LPAR Leasing
Lease an AIX / i5 LPAR
Reduce your costs

www.mtxia.com

Server Leasing
Lease a Server off-site
Reduce your costs

www.mtxia.com

Data Center Automation
Business Continuity and DR
Virtualization/Consolidation

www.mtxia.com

HMC Service
Hardware Management Console
Manage Remote AIX / i5 LPARs

www.siteox.com

Business Web Site Hosting
$3.99 / month includes Tools,
Shopping Cart, Site Builder

www.siteox.com

Disaster Recovery
Small Business Oriented
Off-Site Facilities

www.mtxia.com

IBM pSeries / iSeries
Reduce your Costs
Off-Site Server Hosting

www.mtxia.com

-

Definition of Terms

-


Definition: Data Center Automation (DCA)

Consists of the processes and procedures implemented in a data center environment for the purpose of automating day-to-day activities. These automated activities consist of the following:

  • System deployment, configuration, and implementation
  • High Availability deployment, configuration, and implementation
  • Disaster Recovery deployment, configuration, and implementation
  • Business Continuity compliance, configuration, and implementation
  • Network resources allocation and deallocation
  • Storage resources allocation and deallocation
  • Dynamic CPU and Memory allocation and deallocation
  • Performance Monitoring
  • Error detection and change request submissions
  • Security Management
  • Document Management
  • Change Management
  • Audit Management
  • Service Level Agreements

Additional Information


Definition: Business Continuity (BC)

Consists of the activities performed on a daily basis to ensure the business operates normally today, tomorrow, and beyond. Business continuity is sometimes confused with disaster recovery, but they are separate entities. Disaster recovery is a small subset of business continuity. The business continuity plan may be thought of as a methodology, or as an enterprise wide mentality of conducting day-to-day business.

The components of the business continuity plan and methodology are:

  • Policies - those things that shall be done
  • Guidelines - those things that should be done
  • Standards - technical specifications derived from policies and guidelines
  • Procedures - step-by-step instructions for implementation of standards
  • Resource planning and deployment
  • Organizational Structure
  • Business Impact Analysis (BIA)
  • Security Management
  • Document Management
  • Change Management
  • Audit Management
  • Service Level Agreements

Additional Information


Definition: Disaster Recovery (DR)

The implementation of a project plan which describes the tasks necessary to recover critical business functions after a disaster. The recovery occurs between geographically separated data centers using one or more methods of storage replication between the data centers.

  • Disaster Recovery Planning is the process of creating the disaster recovery project plan.
  • The goal is to minimize downtime for business functions, not systems.
  • Business function recovery times and maximum allowable data loss is specified during the business impact analysis.
  • Implementation of a disaster recovery plan requires management declaration of a disaster.
  • Initiation of the disaster recovery plan is a manual process.

Additional Information


Definition: High Availability (HA)

An automated process for minimizing business function downtime associated with planned or unplanned outages. Typically utilizes replicated hardware platforms to eliminate single points of failure. The business function fail-over normally occurs between two or more physical frames within the same data center using a single shared storage system.

  • Elimination of single points of failure (SPOF's) are a necessary part of HA.
  • The goal is to minimize downtime for business functions, not systems.
  • This is NOT non-stop computing, downtime will be experienced during fail over.

Additional Information


Definition: Business Impact Analysis (BIA)

An examination of ALL business functions to determine those regarded as critical. Should be conducted as a workshop involving executive management and all departments in an organization, this is NOT an information technology activity.

  • Assignment of recovery time objectives for each business function.
  • Assignment of recovery point objectives for each business function.
  • Assignment of support tier associated with each business function.
  • Assignment of Service Level Agreement associated with each support tier.


Definition: Service Level Agreement (SLA)

An agreement between a business function owner and the service provider which designates the amount of time, on an annualized basis, the business function will be available. Conversely, the SLA also designates the amount of time, on an annualized basis, for which the business function will NOT be available.

This should not be regarded as allowable downtime, but rather as mandatory downtime that requires management approval to reschedule.

The SLA is associated with a business function, not with any particular machine, system, or frame.


Definition: Enterprise Wide Unique (EWU)

Refers to a parameter that has one distinct value across any or all platforms throughout the entire enterprise.


Definition: Frame

A physical computing device, which may host one or more partitions or logical systems.


Definition: Partition (LPAR)

A logical grouping of resources such as CPU, Memory, network and SAN adapters


Definition: CPU

  • May be shared between multiple systems simultaneously.
  • Allocated and Deallocated on an as needed basis.
  • SLA may address number of CPUs provided, not underlying processing units.


Definition: Memory

  • Assigned to a single system at a time.
  • May be allocated and deallocated on an as needed basis.
  • May be reassigned during off-peak processing times.


Definition: Virtual I/O (VIO)

  • Virtual representations of physical adapters
  • May be shared between multiple systems simultaneously


Definition: Live Partition Mobility (LPM)

  • An IBM Power6 capability for moving a live running partition from one frame to another
  • Requires virtualized I/O
  • Requires equal or greater CPU and Memory on target frame
  • Requires synchronization of slot numbers between frames
  • Not a high availability or disaster recovery solution
  • Used to eliminate business function downtime utilizing two healthy systems
  • Planned maintenance outages
  • Preemptive problem management


Definition: Network Installation Manager (NIM)


Definition: Partition Load Manager (PLM)

-
Definition of Terms
-
 

Data Center Automation
Business Continuity
Disaster Recovery
High Availability
Business Impact Analysis
Service Level Agreement
Frame
Partition
CPU
Memory
Virtual IO
Live Partition Mobility
Network Install Manager
Partition Load Manager


LPAR Leasing
Lease an AIX / i5 LPAR
Reduce your costs

www.mtxia.com

Server Leasing
Lease a Server off-site
Reduce your costs

www.mtxia.com

Data Center Automation
Business Continuity and DR
Virtualization/Consolidation

www.mtxia.com

HMC Service
Hardware Management Console
Manage Remote AIX / i5 LPARs

www.siteox.com

Business Web Site Hosting
$3.99 / month includes Tools,
Shopping Cart, Site Builder

www.siteox.com

FREE Domain Registration
included with Web Site Hosting
Tools, Social Networking, Blog

www.siteox.com

Disaster Recovery
Small Business Oriented
Off-Site Facilities

www.mtxia.com

IBM pSeries / iSeries
Reduce your Costs
Off-Site Server Hosting

www.mtxia.com