Contact Us | Products/Services | Korn Shell | MicroEMACS


Mt Xia:
Business Continuity/Disaster Recovery Methodologies

 

Procedures


Contact Mt Xia for assistance with your Business Continuity, Disaster Recovery, and High Availability planning and implementation projects at 615.556.0456 or dfrench@mtxia.com

Current:Procedures
Previous:Monitoring
Home Page

Guidelines
Standards
Policies
VIO WLM Enable
WLM AIX 433
WLM AIX 5

Monitoring Procedures

WLM/Jtopas Trending Setup: Performance Data Gathering
This procedure describes how to setup the AIX Workload Manager (WLM) and Jtopas to store trending information to a central location via NFS.
WLM/Jtopas Trending Setup on VIO Server: Performance Data Gathering
This procedure describes how to setup the AIX Workload Manager (WLM) and Jtopas to store trending information from a VIO server to a central location via NFS.
AIX Workload Manager (WLM) Procedures
Procedures for configuring the Workload Manager (WLM) on an AIX Power 5 system and utilizing the information generated.
AIX 4.3.3 Workload Manager (WLM) Procedures
Procedures for configuring the Workload Manager (WLM) on an AIX Power 4 system and utilizing the information generated.

 

For information regarding this page, contact Dana French ( dfrench@mtxia.com )
Copyright 2008 by Mt Xia Inc, All Rights Reserved